Overview

An office block situated in Pretoria, South Africa, the site required a renewable energy system to reduce grid consumption and carbon emissions during the daytime. N.S.E. provided a full EPC/development service implementing a complete grid-tied solar solution. The site now supplements +10% of it’s total demand through solar with an ongoing O&M contract ensuring continuous system performance and optimisation.

Type

Grid-tied

Size

PV 90 kWp
Savings
144,000 kWh p/a

Mount

Roof

ROI

25%

Carbon Offset

130 tons C02 p/a

Other Projects

All articles loaded
No more articles to load