Overview

A luxury Lodge situated in the Chobe National Park, Botswana. The site required a completely off grid renewable energy system as there is no grid connectivity in the area. Primary purpose of the installation was to reduce generator diesel consumption and carbon emissions, as previously this site ran on generators only. The remote location adds to logistical challenges of maintaining constant diesel supply.  N.S.E. provided a full EPC/development service implementing complete microgrid and solar thermal solutions, alongside a full AC reticulation across the site. The project included Solar PV, generators, batteries, AC reticulation, and a centralized solar thermal plant with reticulation.  The site now supplements +95 % of its total demand through solar and solar thermal, with an ongoing O&M contract ensuring continuous system performance and optimization.

Type

Microgrid

Size

PV 205 kWp
Savings
130 000 L p/a

Mount

Ground

ROI

20+%

Carbon Offset

346 ton p/a

Other Projects

All articles loaded
No more articles to load